
{"id":8246,"date":"2023-10-08T17:21:50","date_gmt":"2023-10-08T11:51:50","guid":{"rendered":"http:\/\/kcpalanisamy.com\/?p=8246"},"modified":"2023-10-08T17:21:50","modified_gmt":"2023-10-08T11:51:50","slug":"the-new-road-that-comes-with-the-hand-karur-woe","status":"publish","type":"post","link":"http:\/\/kcpalanisamy.com\/?p=8246","title":{"rendered":"The new road that comes with the hand.. Karur woe!"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/kcpalanisamy.com\/wp-content\/uploads\/2023\/10\/WhatsApp-Image-2023-10-08-at-16.49.12-300x169.jpeg\" alt=\"\" width=\"300\" height=\"169\" class=\"alignnone size-medium wp-image-8247\" srcset=\"http:\/\/kcpalanisamy.com\/wp-content\/uploads\/2023\/10\/WhatsApp-Image-2023-10-08-at-16.49.12-300x169.jpeg 300w, http:\/\/kcpalanisamy.com\/wp-content\/uploads\/2023\/10\/WhatsApp-Image-2023-10-08-at-16.49.12-1024x576.jpeg 1024w, http:\/\/kcpalanisamy.com\/wp-content\/uploads\/2023\/10\/WhatsApp-Image-2023-10-08-at-16.49.12-768x432.jpeg 768w, http:\/\/kcpalanisamy.com\/wp-content\/uploads\/2023\/10\/WhatsApp-Image-2023-10-08-at-16.49.12.jpeg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><br \/>\nThe residents of Karur district have alleged that the tar road laid at a cost of one crore rupees has been constructed in a substandard manner so that it is carried away by hand immediately after it is laid. The people of the area have released a video about the substandard road.<\/p>\n<p>The contractor was involved in the construction of a new tarmac while the existing road was damaged. It is said that the project has been estimated at a cost of one crore 12 lakh rupees to build about 4 kilometres of tarred road.<\/p>\n<p>However, it is said that the existing tarmac road was constructed on top of it without proper tarmac.<\/p>\n<p>The video footage of the public pointing at the road with their hands about the condition of the substandard Tarch Road is currently being circulated on social media.<\/p>\n<p>The people of the area have demanded that action be taken against the contractor who constructed tarpaulin in a substandard manner, cancel the contract, re-inspect, and reconstruct the road in a quality manner.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The residents of Karur district have alleged that the tar road laid at a cost of one crore rupees has been constructed in a substandard manner so that it is carried away by hand immediately after it is laid. The people of the area have released a video about the substandard road. The contractor was [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"image","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-8246","post","type-post","status-publish","format-image","hentry","category-uncategorized","post_format-post-format-image"],"amp_enabled":true,"_links":{"self":[{"href":"http:\/\/kcpalanisamy.com\/index.php?rest_route=\/wp\/v2\/posts\/8246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/kcpalanisamy.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/kcpalanisamy.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/kcpalanisamy.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/kcpalanisamy.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8246"}],"version-history":[{"count":0,"href":"http:\/\/kcpalanisamy.com\/index.php?rest_route=\/wp\/v2\/posts\/8246\/revisions"}],"wp:attachment":[{"href":"http:\/\/kcpalanisamy.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8246"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/kcpalanisamy.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=8246"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/kcpalanisamy.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=8246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}